Gas Piping And Gas Piping Replacement Shaker Heights, Ohio
There Was A Gas Leak In The Concrete Between The Valve And The Fireplace.
Technician Abandoned The Old Line And Installed New Gas Line To The Fireplace.
Shaker Heights, OH
01-24-2022
Gas Piping And Gas Piping Replacement Shaker Heights, Ohio
Removed The Floor Gas Valve And Installed A Regular 1/2
Shaker Heights, OH
10-25-2021
Gas Piping And Gas Piping Replacement Shaker Heights, Ohio
Cut And Capped Off The Water And Gas Lines For This Commercial Unit.
Shaker Heights, OH
09-27-2021
Gas Piping And Gas Piping Replacement Shaker Heights, Ohio
Customer Had Sewer Gas Odor In Half Bath On The First Floor. After Diagnosing The Area In Appears To Be Coming From The Toilet. The Wax Seal Needed Replaced And After Pulling The Toilet To Replace The Wax Seal We Discovered That The Flange That Holds The Toilet Down Was Damaged. Installed A Repair Flange From Above, New T-bolts, New Wax Seal And Re Caulked The Toilet To The Floor. Tested Several Times And Everything Is Working Properly.
SHAKER HEIGHTS, OH
04-18-2011
Gas Piping And Gas Piping Replacement Shaker Heights, Ohio
Completion Of Rough In For Kitchen And Master Bath From Proposal #100852. Media Room And Pot Filler Were Removed From The Scope Of Work On The Proposal. Installed New Kohler Shower Valve And Roughed In For New Fixture Locations.
SHAKER HEIGHTS, OH
04-18-2011
Gas Piping And Gas Piping Replacement Shaker Heights, Ohio
Sanitary Sewer Is Backed Up There Is A Clean Out In The Front Yard That The City Tried To Use Their Machine Through. They Were Unable To Open The Drain From There. Knowing The City Was Unsuccessful We Took Our Large Drain Machine Inside The Basement. Ran The Cable Through About 6 Times And Pulled Allot Of Roots Back Out Of The Sewer. We Looked Down The Clean Out At The Front Of The House And Could See The Water Flowing Through. The Drain Is Open And Flowing But The Roots Will Grow Back In Time.
SHAKER HEIGHTS, OH
04-18-2011
Gas Piping And Gas Piping Replacement Shaker Heights, Ohio
Toilet In Basement Was Backing Up When The Second Floor Bathroom Was Used. Could Not Get The Drain Machine To Go Through The Toilet Drain Because The Cable Would Not Go Around The 4 Cast Iron Tee Buried Under The Floor. Cut Open The Wall And Cut Out A Section Of The 4 Cast Iron Pipe To Install A 4 PVC Clean Out Tee. Medium Drain Cable Machine Would Not Clear The Blockage So We Brought In The Large Drain Machine. The Large Drain Machine Finally Opened The Line. Cut A Piece Of Plywood To Cover The Opening In The Wall And Put Some Plaster Repair On The Small Section Of Wall That Cracked When Installing The Clean Out. Came Back The Following Day And Installed A Repair Flange And Installed The New Toilet Supplied By The Home Owners.
SHAKER HEIGHTS, OH
04-18-2011